Test builder vuh calculation

I have 2 projects. The top one is the default and the bottom one is the one I’m using.
I have set the max vuh to 200 and currently it is at 107.

And this is how it looks in the test builder


It has 2 scenarios. 1 that looks like this

and the other like this

Both scenarios only have 1 request.

The test builder says it’ll only use 13.76vuh. 107 vuh was already used but I can’t run it.
image
107 + 13.76 < 200. How does this thing actually do its calculation? This has been driving me mad.